SO Demolition carried out the complex works at Lasenby House, Kingly st, London for Liberty London Retail. Lasenby House is the main office building situated behind the main store and comprises of 5 floors plus a basement a ground level entrance lobby. As part of the works SO Demolition converted a large area of level 3 into temporary welfare facilities for the retail staff comprising of both male and female toilets, showers and changing areas as well as a shared locker room.
Non-notifiable asbestos removal works were carried out of ACM found on a ‘R&D’ survey arranged by SO Demolition previously.
Temporary power sockets were installed on each level and 110v lighting to all areas. These were all left of site for the client and follow on trades.
Isolations to the exciting AHU and Hot and Cold waters were carried out at each level and all Aircon units internal and external de-gassed and removed by means of dismantling. Larger external pipework was cut out using cold cutting methods and accessed via a fixed scaffolding system installed in the existing light well.
The second floor of this building had a number of challenges. Firstly, a live comms room which housed the real-time till data from the store as well as other important functions. A number of cables to and from this room had to remain live and protected through the soft strip works. secondly redundant services under the RAF left behind at the time of a previous refurbishment. These were unforeseen and managed with the retail units below for out of hours removal.
Internal floor coverings, Fixtures and fittings, skirting boards, Glazed & plasterboard partitioning and RAF including pedestals where all removed from the building. This then living the client with open plan areas on each level to recreate a new office layout.
Additional were also undertaken. These consisted of trail holes in the basement to expose the existing widths and depths of the building padstone footings for the positioning of the new sump pump to be installed. Also the removal of plasterboard lining to 2no internal staircases from basement to roof levels. Removing this exposed the wonderful original glazed brickwork of the exiting building.
Stair way lighting and existing fire alarm system has to remain in situ and all remaining live services marked clearly for the follow on contractor.