LocationGladstone Parade, Edgeware Road
Duration8 weeks
StartJanuary 2021
RolePrinciple Contractor
Works: Waste Clearance, Scaffolding, Demolition, Slab & Footing removal, Crushing, Reduce dig, Piling Mat.

Gladstone Parade was a single large structure consisting of 6 retail units with 2 stories of residential flats above and large 2 storey extensions to the rear. When we secured the project the strip out and asbestos removed had already been completed be a previous contractor previously.

We acted as Principle contractor on this project providing a full site set up including welfare, fire points and pedestrian segregation. We cleared a large amount of fly tip waste at the rear of the building. Our trusted scaffolding contractor then erected the front façade and side elevations while we demolished 2 of the rear extensions. This provided us with the material to create a suitable hard standing which to operate the high reach from.

Once the dust suppression system was in place the main structure could then be demolished. Consisting of timber, brick and steel beams the building was carefully dismantled and the scaffolding removed progressively with the demolition works. The double ground floor slab and footings were then removed and all hardcore arsing piled for crushing.

Even though the site was 2000sqm we had to reduce dig, crush material and form a piling matt simultaneously. Traffic marshals at the site entrance for directing site traffic in and out at all times. The Piling matt was constructed from T1000 Terram, 700mm of 6F2 compacted in 3 times 200mm layers and plate tested for the 45 ton piling rig to follow on. This piling matt was also a 2 level mat.

This project was delivered 2 weeks ahead of schedule, within budget, with no issues and one very happy client.

SO Demolition
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.