08003 891 088 [email protected]
LocationClonards way, Pinner, London, HA5
Duration3 weeks
StartApril 2021
RolePrinciple Contractor
Works:  Soft Strip, Demolition, Slab & Footing removal, Temporary propping, Reduce dig and Piling Mat

Clonard’s Way project was a large 4 bedroom house being converted into a 6 bedroom with an open plan kitchen and lounge. So Demolition provided the utility isolations and welfare set up as well as TW design and propping.

The soft strip included removal of all floor and wall coverings including plaster. Removal of roof coverings back to joists, brick wall removal include the entire rear elevation. Temporary propping was installed as per TW engineers design. SO Demolition completed the full cut and crave in one phase.

The rear extension and patio area was the removed and the new extension area reduce dug, levelled and imported Type 2 installed to form a 150mm piling matt laid on T1000 Terram.

This team done a brilliant job on this project with an impeccable finish. The site was left spotless for the follow on piling contractor and 2 weeks ahead of schedule.

SO Demolition
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.