Clonard’s Way project was a large 4 bedroom house being converted into a 6 bedroom with an open plan kitchen and lounge. So Demolition provided the utility isolations and welfare set up as well as TW design and propping.
The soft strip included removal of all floor and wall coverings including plaster. Removal of roof coverings back to joists, brick wall removal include the entire rear elevation. Temporary propping was installed as per TW engineers design. SO Demolition completed the full cut and crave in one phase.
The rear extension and patio area was the removed and the new extension area reduce dug, levelled and imported Type 2 installed to form a 150mm piling matt laid on T1000 Terram.
This team done a brilliant job on this project with an impeccable finish. The site was left spotless for the follow on piling contractor and 2 weeks ahead of schedule.