This project was Located close to Covent Garden Station in Central London. Comprises or commercial office space over 2 floors above a live retail units and offices within a pedestrian zone area.
The Soft Strip works included the removal of all fixtures and fittings, Glazed and plasterboard partitions, ceilings and floor coverings. Also the removal of all toilet blocks on each level including pipework and screed. We liaised carefully with the tenants below and above as to bring minimal disruption to them and their customers.
All waste was removed each morning between 8am – 9am before the shops opened. All waste was removed progressively throughout the project via an internal lift and loading into wait and load trucks. All M+E services were removed back to the raisers and the raised access floor lifted to removed services below and then put back. Air conditioning units on the roof were dismantled and removed carefully at an agreed time with the residents. The existing fire alarm was maintained and keep live throughout the works.